Synopsis

On the Liantang / Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works – Contract 2 in Hong Kong SAR, Dragages Hong Kong Limited have proposed and implemented two major technical solutions and construction methodologies to overcome the programme constraints and the geotechnical challenges of the 4.8 km long Lung Shan Tunnels section.